Component Location |
1. Back view camera | 2. ECM mirror |
Propeller Shaft: Repair procedures
Replacement
1.
After making a match mark on the flange yoke and transaxle companion, remove the propeller shaft mounting bolts.
Tightening torque :
49.0 ~ 68.6N.m (5.0 ~ 7.0kgf.m, 36.1 ~ 50.6 ...
Canister Close Valve (CCV): Description and Operation
Description
Canister Close Valve (CCV) is installed on the canister
ventilation line. It seals evaporative emission control system by
shutting the canister from the atmosphere when leakage dete ...