Circuit Diagram (1)
Circuit Diagram (2)
CLU1 message signal flow (B > C CAN gateway)
CLU2 message signal flow (B > C CAN gateway)
CLU message 1 signal flow (C > B CAN gateway)
CLU message 3 signa ...
Removal
1.
Disconnect the negative (-) battery terminal.
2.
Remove the cluster fascia panel (A).
3.
Remove the cluster assembly (A) after loosening 4 screws.
4.
Disconnect the cluster ...
Other Information:
A/C Pressure Transducer: Repair procedures
Inspection
1.
Measure the pressure of high pressure line by measuring voltage output between NO.1 and NO.2 terminals.
2.
Inspect the voltage value whether it is sufficient to be regular value ...