Replacement |
Prior to replacing the 4WD ECU, check the 4WD ECU''s clutch
learing with the GDS tool. (Refer to " Coupling assembly " in 4WD group) |
1. |
Remove the lower panel. (Refer to "Crash Pad" in BD group) |
2. |
Remove the IPM.(Refer to "Fuses and Relays" in BE group) |
3. |
Remove the parking brake pedal.(Refer to "Parking Brake System" in BR group) |
4. |
Remove the 4WD ECU(C) after removing the nut (A-2ea) and the connector (B).
|
5. |
Installation is the reverse of removal.
|
Schematic Diagrams
Circuit Diagram
...
Shift Lever: Repair procedures
Removal
1.
Remove the center console assembly.
(Refer to "Interior(console)" in BD group.)
2.
Disconnect sports mode connector (A).
3.
Remove the shift lever assembly (D).
(1)
Take of ...